Resources in the Case Studies category
Adaptation case studies
This set of adaptation case studies was one of the outputs from the Well Adapting East Midlands project with upper tier local authorities in 2011/12. The aim was to provide a range of examples of how adaptation is being delivered in practice across the East Midlands. They include different approaches to the management of flood risk (the main climate risk to the whole of the region) in urban, rural and coastal areas, adaptation and the natural environment, sustainable urban drainage, adaptation and the built environment (in new build and existing stock) and the management of extreme weather events, including severe cold in the upland areas of Derbyshire.
We are grateful to our team of local Climate Change Project Officers who did most of the work on these for their host councils.
More details on Adaptation case studies
Decentralised Energy case studies
Climate East Midlands commissioned the Carbon Trust to run a training programme on Decentralised Energy for local authority planners in 2011/12. This consisted of a series of Masterclasses looking at how different technologies have been utilised in different locations in the East Midlands and the planning issues involved. One of the outputs from the project is a set of Decentralised Energy case studies, which can be downloaded below.
More details on Decentralised Energy case studies
Communities case studies
Growing Climate Friendly Communities Grant enabled eight succesful projects to be delivered, as follows:
The full case studies can be downloaded at the bottom of the page
Greening Beeston: the project has enabled feasibility studies to be carried out to select a suitable community building for the installation of a renewable energy source, for a full feasibility study of the site selected to be completed, and a planning application to be written and submitted. The result has been that Chilwell School is looking to install a 5kW wind turbine.
www.greeninginbeeston.weebly.com
Newstead Enterprise: using the park’s own reed-stock, local volunteers have installed a wet reed-bed system for the disposal of sewage from the Newstead Earth Centre. It is complemented by a Klargester sewage treatment unit to add an extra level of filtration to the system. A functional operating sewerage system has now been constructed to dispose of the centre’s waste in an eco-sensitive way and 24 local volunteers have developed new construction skills.
[email protected]
Oundle Transition Town: by training Household Energy Assessors who have carried out customised energy surveys based on a standard set of documents, householders have become more aware of their energy consumption and their dependence on fossil fuels. During the project, money was raised to purchase an infra red camera. A huge amount of enthusiasm and momentum within the community has been developed which will help the community move towards its aim of reducing its carbon footprint.
[email protected]
St Matthews Community Solutions: the project aimed to get the community to start to think differently about their community. 10 volunteers have attended a
10 week horticulture training, 6 communal planting areas have been developed for the community, including 3 ‘St Matthew’s Fruit Corners’, 4 active wormeries and 2 composters. Two of these areas were full of vegetables which were harvested by the community at the end of the summer 2011. One of the biggest achievements of this project is that it has engaged the local residents to such an extent that 30 residents have signed up, both themselves and their gardens, to the community gardening scheme.
[email protected]
Sustainable Bakewell: the funding has paid for a detailed engineering investigation and hydro energy confirmation study, complete with report. The local consultation process has begun, so that all local stakeholders are engaged in this local renewable venture. Visit www.sustainablebakewell.org.uk or email [email protected]
Sustainable Hayfield: the project has raised awareness of sustainable issues within the community, reaching out through a series of community events. Energy assessments have been carried out on 8 core housing types and a road map for each house type has been created , showing how to improve its energy efficiency. Relevant and practical advice has been provided to help householders make energy efficiency improvements. An energy audit has been carried out on the local school, to kick start their carbon reduction programme.
[email protected]
Transition Chesterfield: Fossil Fuel to Pedal Power has provided cycle training and pedal-powered solutions for people in Chesterfield to reduce reliance on fossil fuels and help to tackle local and global CO2 emissions, as well as encouraging healthy living and practical, sustainable transport. 60 people attended 3-hour bike mechanics workshops, 48 Bikeability cycle training places were filled, 7 events have been run where cycling has been promoted, through information and demonstration. All of these events have included a free Dr. Bike service offering people bike checks with adjustments and repairs. 6 people have taken part in a load carrying (cargo) bike building project, involving further professional training in brazing, welding and workshop skills. One cargo bike has been completed and another in under construction. 2 bikes have been re-homed. Transition Chesterfield now has 3 fully qualified bike mechanics and has encouraged people to get their old bikes out their shed, get them into working order, and most importantly, start to use them.
[email protected]
Transition West Bridgford: this project has enabled members of the public with opportunities to see green new build and low energy refurbishment work in progress. The theory behind the idea is that seeing completed projects is inspiring, but seeing them in progress is more informative because the real energy efficiency features are usually invisible by the time the work is complete. During the project, the Eco House Group has grown from 100 to 170 members, with high levels of attendance and interest at events. Home-owners’ knowledge about low energy houses has improved, and many are seriously planning ahead to carry out significant work on their own homes. This includes a number of people living in “hard to treat” solid wall homes who are now considering major work that includes insulation or even whole house low energy retrofit. The wider interest that this project has generated, led to a presentation about the project at the AECB (sustainable builders’ association) annual conference in September 2011.
www.wbecohouses.co.uk
More details on Communities case studies
The development and adoption of a sustainable timber procurement policy
This case study has been published by the North East Improvement and Efficiency Partnership, The Central Point of Expertise for Timber Procurement (CPET), and Durham County Council.
From the introduction:
"The purpose of this case study is to describe the development of a local authority sustainable timber procurement policy and the progress made to date in its implementation. This policy developed is the first local authority policy which is consistent with the UK Government national policy on timber procurement."
This resource relates to the Sustainable Timber Procurement session at the "Carbon Allsorts" event on 15th July 2010, during Changing Climate Weeks.
More details on The development and adoption of a sustainable timber procurement policy